THEME PARK CONSTRUCTION PROJECT CHECKLIST TEMPLATE Created by ChecklistGuro (https://checklistguro.com) --- PLANNING & PERMITTING --- [ ] Project Name [ ] Project Start Date (Planned) [ ] Estimated Project Budget [ ] Zoning Compliance (Compliant, Non-Compliant - Requires Variance) [ ] Environmental Impact Assessment Report [ ] Required Permits (Building Permit, Environmental Permit, Operating License, Fire Safety Permit) [ ] Permit Application Submission Date --- SITE PREPARATION & DEMOLITION --- [ ] Detailed Site Assessment Report [ ] Estimated Demolition Volume (Cubic Yards) [ ] Existing Structures to be Demolished (Building A, Building B, Shed, Fence) [ ] Scheduled Demolition Start Date [ ] Environmental Impact Mitigation Plan [ ] Demolition Method Selected (Mechanical, Implosion, Manual) [ ] Site Survey Map --- FOUNDATION & INFRASTRUCTURE --- [ ] Foundation Depth (meters) [ ] Soil Bearing Capacity (kPa) [ ] Foundation Type (Slab-on-Grade, Piles, Mat Foundation) [ ] Soil Testing Completion Date [ ] Soil Testing Report Summary [ ] Water Table Depth (meters) [ ] Utility Main Connection Type (Direct Connection, Metered Connection) --- RIDE & ATTRACTION CONSTRUCTION --- [ ] Ride Height (meters) [ ] Maximum Ride Capacity (Guests) [ ] Scheduled Delivery Date of Primary Ride Components [ ] Ride Foundation Location Coordinates [ ] Ride Safety System Features (Select All) (Emergency Stop System, Restraint System, Sensor Array, Backup Power System) [ ] Detailed Ride Construction Notes [ ] Ride Design Blueprints --- BUILDING & THEMING --- [ ] Facade Material Quantity (sq ft) [ ] Facade Design Render [ ] Theming Style Consistency Check (Consistent, Minor Adjustments Needed, Significant Revisions Required) [ ] Detailed Description of Interior Theming [ ] Scheduled Mural Painting Completion Date [ ] Number of Themed Lighting Fixtures Installed [ ] Theming Elements Confirmed (check all that apply) (Landscaping, Murals, Signage, Props, Soundscapes) --- LANDSCAPING & GROUNDS --- [ ] Total Area for Landscaping (sq ft) [ ] Plant Selection Categories (Trees, Shrubs, Ground Cover, Flowers, Grass/Turf, Water Features) [ ] Landscape Design Plan [ ] Irrigation System Installation Date [ ] Notes on Soil Composition & Amendments [ ] Mulch Type (Wood Chips, Pine Straw, Rubber Mulch, Rock) [ ] Location of Main Entrance Landscaping --- UTILITIES & SYSTEMS --- [ ] Main Power Supply Voltage (kV) [ ] Emergency Generator Capacity (kW) [ ] HVAC System Type (Chilled Water, DX, VRF) [ ] Initial Plumbing System Pressure Test Date [ ] Scheduled System Calibration Time [ ] Detailed Description of Security System Components [ ] Electrical System Schematic --- SAFETY & INSPECTIONS --- [ ] Inspection Date [ ] Inspection Time [ ] Inspection Type (Daily Safety Walkthrough, Crane Inspection, Ride Safety Check, Electrical Safety, Structural Inspection) [ ] Temperature (Fahrenheit) [ ] Wind Speed (MPH) [ ] Observations/Comments [ ] Hazards Identified (Unsafe Work Practices, Equipment Malfunction, Lack of PPE, Environmental Hazard) [ ] Inspector Signature --- RIDE TESTING & COMMISSIONING --- [ ] Ride Cycle Test Count [ ] Maximum Load Test Count [ ] First Operational Test Date [ ] First Operational Test Time [ ] Ride Operational Status (Not Started, In Progress, Completed, Failed) [ ] Ride Test Observations [ ] Ride Test Video Evidence [ ] Ride Test Engineer Signature --- FINAL WALKTHROUGH & HANDOVER --- [ ] Walkthrough Date [ ] Walkthrough Start Time [ ] Overall Project Summary & Key Achievements [ ] Outstanding Issues Requiring Attention [ ] Number of Open Safety Items [ ] Areas Inspected & Verified (Select all that apply) (Rides & Attractions, Buildings & Facilities, Landscaping & Grounds, Utilities & Systems, Safety & Security) [ ] Construction Manager Signature [ ] Client Representative Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/project-management/theme-park-construction-project-checklist-template (Click "Install Template" to launch your digital inspection tool immediately)