TPM (TOTAL PRODUCTIVE MAINTENANCE) CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- AUTONOMOUS MAINTENANCE (JISHU HOZEN) --- [ ] Date of Last Cleaning [ ] Description of Cleaning Performed [ ] Time Spent on Cleaning (minutes) [ ] Any Abnormal Noises/Vibrations Observed? [ ] Leaks Observed (Oil, Water, etc.) - Location & Type [ ] Lubricant Level Check (if applicable) (Full, Low, Overfilled, Not Applicable) [ ] Visual Inspection Items Checked (Guards in Place, Hoses & Fittings, Belts & Chains, Wiring & Cables, Fasteners, Overall Cleanliness) [ ] Next Scheduled Autonomous Maintenance Date [ ] Operator Comments/Observations --- PLANNED MAINTENANCE (SEISO/INSPECTIONS) --- [ ] Last Cleaning Date [ ] Cleaning Notes (Areas cleaned, issues found) [ ] Lubricant Quantity (Units) [ ] Lubricant Type (Type A, Type B, Type C) [ ] Vibration Reading (mm/s) [ ] Visual Inspection Result (Normal, Minor Wear, Significant Wear, Damage) [ ] Detailed Inspection Comments [ ] Next Lubrication Due Date [ ] Inspection Photos (Optional) --- FIXED/PREDICTIVE MAINTENANCE (KIKAKU HOZEN) --- [ ] Last Vibration Analysis Date [ ] Bearing Temperature (Celsius) [ ] Motor Current (Amps) [ ] Pressure Readings (PSI) [ ] Lubricant Type (Oil, Grease, Synthetic, Other) [ ] Notes from Previous Predictive Maintenance [ ] Infrared Image (if applicable) [ ] Time of Last Oil Sample Analysis [ ] Condition of Filter (Visual) (Excellent, Good, Fair, Poor) --- EARLY FAILURE DETECTION (YOJU KANRI) --- [ ] Bearing Temperature (Celsius) [ ] Vibration Level (mm/s) [ ] Motor Current (Amps) [ ] Unusual Noise Observed? (Yes, No, Unsure) [ ] Describe any unusual noises or behaviors. [ ] Lubricant Condition (Visual Inspection) (Clean, Slightly Discolored, Discolored, Contaminated) [ ] Date of Last Leak Detection Inspection [ ] Any anomalies detected during inspection (detailed notes) --- SAFETY & ERGONOMICS (ANZENSEN): --- [ ] PPE (Personal Protective Equipment) Utilized? (Safety Glasses, Gloves, Hearing Protection, Safety Shoes, Respirator, High-Visibility Vest) [ ] Noise Level (dB) during maintenance [ ] Ergonomic Risk Assessment Completed? (Yes, No, N/A) [ ] Any ergonomic concerns observed? [ ] Lockout/Tagout (LOTO) Procedure followed? (Yes, No, N/A) [ ] Last Ergonomic Risk Assessment Date [ ] Incident/Near Miss Reporting (if applicable) [ ] Areas requiring ergonomic improvements? (Lifting, Repetitive Motions, Awkward Postures, Forceful Exertions, Vibration) --- MAINTENANCE PLANNING & PREPARATION (MITASHI HOZEN) --- [ ] Planned Maintenance Date [ ] Planned Maintenance Start Time [ ] Estimated Maintenance Time (hours) [ ] Detailed Maintenance Procedure/Steps [ ] Required Tools (Wrenches, Screwdrivers, Specialized Tools, Calibration Equipment, Other) [ ] Required Spare Parts (Filter A, Bearing B, Seal C, Belt D, Other Parts) [ ] Maintenance Checklist/Diagram [ ] Notes/Comments regarding preparation --- EQUIPMENT IMPROVEMENT (KAIZEN) --- [ ] Describe any design changes implemented to reduce maintenance frequency. [ ] Estimated cost savings from implemented equipment improvements (USD). [ ] Which improvement techniques were used (e.g., FMEA, 5S, Poke-yoke)? (FMEA (Failure Mode and Effects Analysis), 5S, Poke-yoke (Mistake-proofing), DFMEA (Design Failure Mode and Effects Analysis), PFMEA (Process Failure Mode and Effects Analysis), Other (Specify in LONG_TEXT)) [ ] Detail any changes made to reduce the complexity of maintenance tasks. [ ] Reduction in MTBF (Mean Time Between Failures) due to improvement (hours). [ ] Date of Kaizen implementation. [ ] Describe any changes made to equipment materials to increase lifespan or reduce corrosion. --- TRAINING & DOCUMENTATION --- [ ] Maintenance Procedure Review & Updates [ ] Hours of TPM Training Completed (per operator) [ ] Date of Last TPM Training Session [ ] TPM Training Modules Covered (Autonomous Maintenance, Planned Maintenance, Fixed/Predictive Maintenance, Early Failure Detection, Safety & Ergonomics, Maintenance Planning, Equipment Improvement) [ ] Upload Training Records (certificates, attendance sheets) [ ] Trainer Qualification Level (Certified TPM Trainer, Experienced Maintenance Technician, Other (Specify in LONG_TEXT)) [ ] Specify 'Other' Trainer Qualification (if selected) [ ] Date of last documentation review --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/tpm-total-productive-maintenance-checklist (Click "Install Template" to launch your digital inspection tool immediately)