TRAM POWER SUPPLY & DISTRIBUTION SYSTEM INSPECTION CHECKLIST TEMPLATE Created by ChecklistGuro (https://checklistguro.com) --- SUBSTATION INPUT POWER --- [ ] Voltage Input (kV) [ ] Current Input (Amps) [ ] Power Factor [ ] Last Transformer Oil Analysis Date [ ] Phase Condition (A, B, C) (Phase A, Phase B, Phase C, Normal) [ ] Any unusual noises or vibrations observed? [ ] Upload photo of Input Power Meter --- MAIN TRANSFORMERS --- [ ] Input Voltage (kV) [ ] Output Voltage (kV) [ ] Load Percentage (%) [ ] Oil Temperature (°C) [ ] Visual Inspection Notes (e.g., leaks, corrosion) [ ] Tap Changer Status (Online, Offline, Manual, Automatic) [ ] Last Oil Analysis Date [ ] Attach Oil Analysis Report --- SWITCHGEAR AND CIRCUIT BREAKERS --- [ ] Circuit Breaker Trip Current (Amps) [ ] Switchgear Operating Voltage (Volts) [ ] Circuit Breaker Condition (Excellent, Good, Fair, Poor) [ ] Switchgear Visual Inspection (No Visible Damage, Minor Damage, Significant Damage) [ ] Last Maintenance Date [ ] Last Operation Time --- FEEDER CABLES AND CONNECTIONS --- [ ] Cable Temperature (°C) [ ] Connection Resistance (mΩ) [ ] Cable Insulation Condition (Excellent, Good, Fair, Poor) [ ] Signs of Corrosion? (Yes, No) [ ] Detailed Observations [ ] Cable Condition Photos [ ] Cable Location (GPS) --- TRACTION SUBSTATIONS (TSS) --- [ ] Substation Voltage (kV) [ ] Output Current (Amps) [ ] Circuit Breaker Status (Open, Closed, Tripped) [ ] Transformer Oil Condition (Normal, Slightly Discolored, Severely Discolored, Water Present) [ ] Any unusual noises or observations? [ ] Last Maintenance Date [ ] Time of Inspection [ ] Upload any relevant photos --- OVERHEAD CATENARY FEEDERS --- [ ] Feeder Voltage (kV) [ ] Feeder Current (Amps) [ ] Feeder Wire Condition (Excellent, Good, Fair, Poor) [ ] Insulator Condition (Excellent, Good, Fair, Poor) [ ] Potential Issues Observed (Corrosion, Damage, Sagging, Loose Connections, None) [ ] Detailed Observations/Comments [ ] Photos/Videos of Feeder [ ] Feeder Location (GPS Coordinates) --- VOLTAGE AND CURRENT MEASUREMENTS --- [ ] Voltage at Substation Input (kV) [ ] Current at Substation Input (A) [ ] Voltage at TSS 1 (kV) [ ] Current at TSS 1 (A) [ ] Voltage at TSS 2 (kV) [ ] Current at TSS 2 (A) [ ] Voltage at Section A (kV) [ ] Current at Section B (A) --- GROUNDING SYSTEM --- [ ] Ground Resistance (Ohms) [ ] Potential Gradient (mV) [ ] Visual Inspection of Ground Rods (Good, Fair, Poor, Corroded) [ ] Notes on Grounding System Condition [ ] Bonding Jumper Integrity (Intact, Corroded, Missing) [ ] Grounding System Photos --- PROTECTIVE DEVICES & RELAYS --- [ ] Breaker Trip Current Setting (kA) [ ] Relay Operating Time (seconds) [ ] Relay Test Result (Pass/Fail) (Pass, Fail) [ ] Fuse Condition (Good/Damaged/Unknown) (Good, Damaged, Unknown) [ ] Last Relay Test Time [ ] Comments on Relay Performance --- EMERGENCY POWER SYSTEMS --- [ ] UPS Battery Voltage (V) [ ] Generator Run Time (hours) [ ] Last Generator Test Date [ ] Last Generator Test Start Time [ ] Generator Status (Operational, Needs Maintenance, Out of Service) [ ] Notes on Emergency Power System Condition [ ] Generator Test Report --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/public-transport-management/tram-power-supply-distribution-system-inspection-checklist-template (Click "Install Template" to launch your digital inspection tool immediately)