TREE PROTECTION MEASURES CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-CONSTRUCTION PLANNING & ASSESSMENT --- [ ] Description of Existing Trees (Species, Size, Condition) [ ] Arborist Report (if required) [ ] Are trees located within the construction footprint? (Yes, No) [ ] Distance from construction area to trees (minimum) [ ] Identify Potential Hazards to Trees (Check all that apply) (Proximity to Excavation, Changes in Ground Level, Soil Compaction, Chemical Spillage, Vibration from Machinery, Physical Impacts) [ ] Date of Arborist Assessment (if applicable) [ ] Summary of Proposed Tree Protection Plan --- TREE PROTECTION ZONE (TPZ) ESTABLISHMENT --- [ ] TPZ Radius Determined by Arborist? (Yes, No) [ ] TPZ Radius (meters) [ ] Justification for TPZ Radius (if not standard) [ ] TPZ Map/Diagram (showing location and radius) [ ] TPZ Marking Method (Heritable Fencing (e.g., plastic barrier), Tape & Flags, Other (specify)) [ ] If 'Other' for TPZ Marking, please describe: [ ] TPZ Boundary Coordinates (if needed for mapping) --- ROOT PROTECTION MEASURES --- [ ] Minimum Distances to Tree Trunks (meters) [ ] Description of Root Protection Fence Specifications (e.g., height, mesh size, material) [ ] Root Protection Fence Layout Plan (showing location and extent) [ ] Root Protection Methods Used: (Root Protection Fence, No-Dig Zone, Air Spade Excavation, Temporary Boardwalks, Other (Specify in Long Text)) [ ] If 'Other' selected above, please specify root protection methods. [ ] Are Underground Utilities Known to Impact Root Zones? (Yes, No, Unknown) [ ] If yes to above, describe utility locations and planned mitigation strategies. [ ] Date Root Protection Measures Installed [ ] Has a qualified Arborist inspected the root protection measures? (Yes, No, Not Applicable) --- TRUNK & BRANCH PROTECTION --- [ ] Tree Wrapping Required? (Yes, No, Uncertain) [ ] Number of Tree Wraps Applied [ ] Description of Trunk Protection Method [ ] Photos of Trunk Protection [ ] Branch Pruning Required? (Yes - Approved by Arborist, No, Uncertain) [ ] Reason for Branch Pruning (if applicable) [ ] Protection from Machinery Impacts? (Physical Barrier Installed, Distance Markers Established, No Protection) [ ] Description of Machinery Impact Protection --- GROUND PROTECTION --- [ ] Estimated Soil Compaction Limit (PSI) [ ] Ground Protection Methods Employed (Select all that apply) (Heras Fencing, Mulching (Specify type and depth in LONG_TEXT), Air Spade Excavation, Temporary Access Tracks (Specify material), Other (Specify in LONG_TEXT)) [ ] Description of Mulch Type and Depth (If applicable) [ ] Description of Temporary Access Track Materials (If applicable) [ ] Photos of Ground Protection Installation [ ] Thickness of Protective Layer (inches/cm) [ ] Method for ensuring soil aeration (No aeration required, Air spikes, Other (Specify in LONG_TEXT)) --- MONITORING & SUPERVISION --- [ ] Date of TPZ Inspection [ ] Time of TPZ Inspection [ ] Summary of TPZ Condition (e.g., soil saturation, debris presence) [ ] Distance from TPZ edge of construction activity (meters) [ ] Were contractors briefed on TPZ requirements? (Yes, No, N/A) [ ] What protection measures were observed to be correctly implemented? (Root barriers in place, Trunk protectors installed, Ground protection covering TPZ, Signage clearly visible, Other (Specify in LONG_TEXT)) [ ] Details of any non-compliance or deviations from approved TPZ plan. [ ] Were corrective actions taken to address non-compliance? (Yes, No, N/A) [ ] Attach Photos/Video of TPZ Condition (evidence of compliance/non-compliance) [ ] Inspector Signature --- POST-CONSTRUCTION MANAGEMENT --- [ ] Date of Site Handover/Project Completion [ ] Notes on Tree Condition at Project Completion (compared to pre-construction) [ ] Estimated Time for Tree Recovery (in months) [ ] Recommended Post-Construction Care (Select all that apply) (Watering, Fertilizing, Mulching, Pruning (if necessary), Pest & Disease Monitoring) [ ] Specific Actions Recommended for Tree Recovery/Maintenance [ ] Photographic Evidence of Tree Condition Post-Construction [ ] Overall Tree Health Assessment Post-Construction (compared to pre-construction) (Significantly Improved, Improved, Stable, Slightly Deteriorated, Deteriorated) [ ] Contact Person for Post-Construction Tree Care (Name) [ ] Contact Phone Number for Post-Construction Tree Care --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/tree-protection-measures-checklist (Click "Install Template" to launch your digital inspection tool immediately)