UNDERGROUND MINE VENTILATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-SHIFT VENTILATION CHECKS --- [ ] Date of Inspection [ ] Inspection Start Time [ ] Ventilation Control Room Location [ ] Main Fan Operational Status (Operational, Degraded, Not Operational) [ ] Auxiliary Fan Operational Status (Operational, Degraded, Not Operational) [ ] Main Fan Amperage (A) [ ] Auxiliary Fan Amperage (A) [ ] Notes/Observations [ ] Inspector Signature --- AIRFLOW MONITORING --- [ ] Airflow Rate (m³/s) [ ] Static Pressure (Pa) [ ] Fan Status (Operating, Standby, Faulted) [ ] Temperature (Celsius) [ ] Monitoring Date [ ] Monitoring Time [ ] Monitoring Location (Ventilation Point) [ ] Notes/Observations --- VENTILATION CONTROLS INSPECTION --- [ ] Fan 1 RPM [ ] Fan 2 RPM [ ] Damper 1 Position (Open/Closed/Partially Closed) (Open, Closed, Partially Closed) [ ] Damper 2 Position (Open/Closed/Partially Closed) (Open, Closed, Partially Closed) [ ] Air Pressure at Regulator A (kPa) [ ] Notes on Control Operation or Issues [ ] Last Calibration Date (Regulator A) [ ] Inspector Signature --- DILUTION VENTILATION ASSESSMENT --- [ ] Methane Concentration (ppm) [ ] Oxygen Concentration (%) [ ] Carbon Dioxide Concentration (%) [ ] Dust Concentration (mg/m³) [ ] Ventilation Effectiveness (Qualitative) (Excellent, Good, Fair, Poor) [ ] Observations & Notes [ ] Dilution Ventilation Control Status (Operational, Degraded, Non-Operational) --- FIRE SUPPRESSION VENTILATION CHECKS --- [ ] Fire Suppression Fan Status (Operational, Standby, Faulted) [ ] Fire Suppression Fan RPM [ ] Fire Water Spray Nozzle Condition (Clear, Partially Blocked, Blocked) [ ] Last Fire Suppression System Test Date [ ] Time of Fire Suppression System Activation (if applicable) [ ] Notes on Fire Suppression Ventilation System Performance --- EMERGENCY VENTILATION PROCEDURES --- [ ] Emergency Ventilation System Activation Procedure Reviewed? (Yes, No) [ ] Time to Activate Emergency Ventilation (minutes) [ ] Brief Description of Actions Taken During Emergency Ventilation Activation [ ] Date of Last Emergency Ventilation Drill [ ] Time of Last Emergency Ventilation Drill Start [ ] Emergency Ventilation Routes Verified Clear? (Main Route, Alternate Route 1, Alternate Route 2) [ ] Signature of Person Verifying Emergency Ventilation Procedures --- VENTILATION OBSTRUCTION CHECKS --- [ ] Location of Obstruction Check (e.g., Face, Return Airway) [ ] Potential Obstruction Types Observed (Rockfall, Equipment, Debris, Vegetation, Other) [ ] Description of Obstruction (if any) [ ] Estimated Obstruction Size (e.g., in meters/feet) [ ] Obstruction Clearance Status (Cleared, Partially Cleared, Not Cleared) [ ] Date of Clearance (if applicable) [ ] Time of Clearance (if applicable) [ ] Inspector Signature --- GAS MONITORING EQUIPMENT CALIBRATION --- [ ] Calibration Date [ ] Span Gas Concentration (ppm) [ ] Zero Gas Concentration (ppm) [ ] Reading at Zero Gas (ppm) [ ] Reading at Span Gas (ppm) [ ] Calibration Successful? (Yes, No, N/A) [ ] Calibration Notes (if applicable) [ ] Calibrator Signature [ ] Equipment ID --- DOCUMENTATION & RECORD KEEPING --- [ ] Check Date [ ] Check Time [ ] Previous Incident Count (Last 12 Months) [ ] Summary of Findings/Observations [ ] Supporting Documentation (e.g., airflow readings, gas monitoring reports) [ ] Corrective Actions Required? (Yes, No) [ ] Description of Corrective Actions (If Yes) [ ] Inspector Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mining-management/underground-mine-ventilation-checklist (Click "Install Template" to launch your digital inspection tool immediately)