UTILITIES COORDINATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-CONSTRUCTION PLANNING & DESIGN --- [ ] Define Project Utility Requirements [ ] Estimated Utility Load (kW/kVA) [ ] Utility Provider(s) Identified? (Yes, No, Unknown) [ ] Target Date for Utility Coordination Plan Completion [ ] Preliminary Site Utility Plans (if available) [ ] Types of Utilities Involved (select all that apply) (Electric, Water, Gas, Sewer, Telecommunications, Stormwater, Other (specify in Long Text)) [ ] Specify 'Other' Utilities (if selected) --- UTILITY LOCATION & VERIFICATION --- [ ] Request for Utility Records Submitted? (Yes, No, Pending) [ ] Date of Utility Record Request [ ] Summary of Received Utility Records (e.g., Maps, Drawings, Reports) [ ] Upload Utility Record Drawings/Maps (PDF, DWG, etc.) [ ] Type of Utility Location Verification Method Used? (Utility Company Field Survey, Ground Penetrating Radar (GPR), Pot Holing, Existing Drawings Only, Other) [ ] Details of Verification Method (if 'Other' selected above) [ ] Depth of Utilities Verified (feet/meters) [ ] Description of Any Discrepancies Found Between Records and Actual Location [ ] Resolution of Discrepancies Verified? (Yes, No, Pending) [ ] Details of Resolution Method. --- COORDINATION WITH UTILITY COMPANIES --- [ ] Initial Utility Company Contact Made? (Yes, No) [ ] Date of Initial Utility Company Contact [ ] Summary of Initial Contact & Discussion Points [ ] Utility Company Representative Assigned? (Yes, No) [ ] Representative's Name [ ] Representative's Contact Information (Phone/Email) [ ] Requested Connection Capacity (e.g., kVA, gallons/minute) [ ] Description of Agreed-Upon Connection Points & Requirements [ ] Utility Company Provided Connection Diagrams/Specifications --- CONSTRUCTION & INSTALLATION --- [ ] Scheduled Utility Tie-in Date [ ] Estimated Time for Utility Tie-in [ ] Details of Utility Company Representative On-Site (Name, Contact Info) [ ] Utility Pressure/Voltage Readings (Before & After Tie-in) [ ] Utility Protection Measures Implemented (Select all that apply) (Silt Fences, Utility Marker Flags, Excavation Shoring, Bore Path Monitoring, Other (Specify in Long Text)) [ ] Notes on any deviations from the approved Utility Installation Plan [ ] Photos/Videos of Utility Tie-in Process [ ] Utility Tie-in Success? (Yes, No, Partial) --- AS-BUILT DOCUMENTATION & HANDOVER --- [ ] Date of As-Built Survey Completion [ ] Summary of Deviations from Original Plans [ ] As-Built Drawings (PDF) [ ] Updated Utility Schedules (Excel/CSV) [ ] Updated Utility Types Documented? (Gas, Water, Electrical, Telecom, Sewer, Other) [ ] Number of Revised Utility Records Created [ ] Description of any special handover instructions [ ] Handover Status (Pending, Completed, Partial) [ ] Contractor Representative Signature [ ] Client Representative Signature --- SAFETY & ENVIRONMENTAL CONSIDERATIONS --- [ ] Identify Potential Environmental Impacts (e.g., soil erosion, water contamination) (Soil Erosion, Water Contamination, Air Quality Degradation, Noise Pollution, Impacts to Vegetation, Other (Specify in LONG_TEXT)) [ ] Specify 'Other' Environmental Impacts (if selected) [ ] Utility Company's Environmental Protection Plan Reviewed? (Yes, No, N/A) [ ] Distance of work zone from sensitive environmental areas (e.g., wetlands, streams) [ ] Date of Environmental Risk Assessment [ ] Confined Space Entry Permit Required for Utility Work? (Yes, No, N/A) [ ] Upload Confined Space Entry Permits (if applicable) [ ] Traffic Control Plan in Place for Utility Work? (Yes, No, N/A) [ ] Describe Specific Safety Precautions for Utility Work (e.g., lockout/tagout procedures) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/utilities-coordination-checklist (Click "Install Template" to launch your digital inspection tool immediately)