WAREHOUSE WMS CAPACITY PLANNING CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- DEMAND FORECASTING ACCURACY --- [ ] Forecast Accuracy Rate (%) [ ] Description of Forecasting Methodology [ ] Software Used for Forecasting (Excel, Dedicated Forecasting Software, Other) [ ] Average Forecast Error (Units) [ ] Date of Last Forecast Review [ ] Data Sources Used for Forecasting (Historical Sales Data, Market Trends, Promotional Plans, Economic Indicators) --- STORAGE SPACE UTILIZATION --- [ ] Overall Rack Space Utilization (%) [ ] Average Pallet Density per Rack Level [ ] Racking Type in Use (Selective Pallet Racking, Drive-In Racking, Flow Racking, Pallet Shuttle, Other) [ ] Description of Current Storage Layout [ ] Percentage of Empty Rack Locations [ ] Areas of Low Utilization (Select all that apply) (Top Rack Levels, Back of Warehouse, Specific Aisles, Seasonal Storage Areas, None) --- RECEIVING CAPACITY ASSESSMENT --- [ ] Number of Dock Doors [ ] Average Daily Receipts (Units) [ ] Peak Daily Receipts (Units) [ ] Receiving Labor Available (Full-Time Equivalents) [ ] Current Receiving Process (Manual, Semi-Automated, Fully Automated) [ ] Describe any current bottlenecks in the receiving process [ ] Date of last Receiving Capacity Review --- PUTAWAY RESOURCE EVALUATION --- [ ] Current Number of Putaway Laborers [ ] Average Putaway Rate (Units/Laborer/Hour) [ ] Primary Putaway Equipment (Forklift, Pallet Jack, Automated Guided Vehicle (AGV), Manual) [ ] Number of Available Forklifts/Pallet Jacks [ ] Description of Current Putaway Process [ ] Current Putaway Method (Directed, Random, Zone, FIFO) [ ] Average Time to Complete Putaway (Minutes) --- PICKING & PACKING CAPACITY --- [ ] Average Orders Processed Per Hour [ ] Peak Hour Order Volume [ ] Number of Picking Stations [ ] Average Pick Time Per Order (minutes) [ ] Number of Packing Stations [ ] Average Packing Time Per Order (minutes) [ ] Picking Method (Zone Picking, Wave Picking, Batch Picking, Discrete Picking) [ ] Notes on Bottlenecks or Challenges --- SHIPPING CAPACITY & DOCK SCHEDULING --- [ ] Number of Dock Doors Available [ ] Average Dock Door Utilization Rate (%) [ ] Maximum Number of Shipments Per Day [ ] Average Dock Door Turnaround Time (Minutes) [ ] Earliest Shipping Start Time [ ] Latest Shipping End Time [ ] Dock Scheduling Method (First Come, First Served, Priority Scheduling, Appointment-Based) --- LABOR AVAILABILITY & SKILL SETS --- [ ] Current Number of Warehouse Associates [ ] Projected Number of Associates Needed (Next 6 Months) [ ] Dominant Skill Set Deficiency (Forklift Certification, Picking & Packing, WMS Software Proficiency, Receiving and Inspection, General Labor) [ ] Training Programs Currently Offered (Forklift Certification, WMS Software Training, Safety Procedures, Picking Optimization) [ ] Date of Last Workforce Skills Assessment [ ] Description of Current Labor Challenges --- EQUIPMENT MAINTENANCE & RELIABILITY --- [ ] Last Preventative Maintenance Date [ ] Total Equipment Downtime (Hours) - Last Month [ ] Description of Recent Equipment Issues/Repairs [ ] Equipment Condition Rating (1-5) (1 - Critical, 2 - Poor, 3 - Fair, 4 - Good, 5 - Excellent) [ ] Next Scheduled Maintenance Date [ ] Number of Critical Equipment Failures Last Quarter --- AUTOMATION POTENTIAL ASSESSMENT --- [ ] Describe current manual processes suitable for automation. [ ] Which automation technologies are being considered? (Automated Guided Vehicles (AGVs), Automated Storage and Retrieval Systems (AS/RS), Robotics (Pick and Place), Conveyor Systems, Voice Picking Systems, Automated Labeling Systems) [ ] Estimated ROI (Return on Investment) for automation implementation. [ ] Estimated cost of automation implementation. [ ] Target implementation date for automation. [ ] Level of automation being considered (e.g., Partial, Full) (Partial Automation, Full Automation) --- PEAK SEASON PLANNING & SCALABILITY --- [ ] Projected Peak Season Order Volume Increase (%) [ ] Additional Labor Needed (Full-Time Equivalents) [ ] Extra Dock Doors Required (Number) [ ] Start Date of Peak Season Prep (YYYY-MM-DD) [ ] End Date of Peak Season (YYYY-MM-DD) [ ] Peak Season Strategy (Temporary Staffing, Overtime, Extended Hours, Contracted Logistics) [ ] Potential Bottlenecks During Peak Season (Receiving, Putaway, Picking, Packing, Shipping, Order Management) --- WAREHOUSE LAYOUT OPTIMIZATION --- [ ] Describe current warehouse layout challenges. [ ] Current average travel distance per pick (feet). [ ] Primary layout type (e.g., flow-through, U-shaped, I-shaped). (Flow-Through, U-Shaped, I-Shaped, Other) [ ] Which areas are experiencing bottlenecks? (Receiving, Storage, Picking, Packing, Shipping) [ ] Describe proposed layout changes and rationale. [ ] Estimated reduction in travel distance with new layout (%). --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/wms/warehouse-wms-capacity-planning-checklist (Click "Install Template" to launch your digital inspection tool immediately)