WATERPROOFING MEMBRANE INSTALLATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-INSTALLATION & SITE PREPARATION --- [ ] Project Number [ ] Scheduled Installation Date [ ] Existing Conditions Report (describe site conditions) [ ] Substrate Type (e.g., Concrete, Wood) (Concrete, Wood, Metal, Other) [ ] Site Hazards Identified (check all that apply) (Uneven Surface, Sharp Objects, Standing Water, Vegetation, Proximity to Traffic, Environmental Concerns) [ ] Surface Temperature (°C/°F) [ ] Ambient Temperature (°C/°F) [ ] Weather Conditions (Clear, Cloudy, Rain, Snow, Windy) [ ] Description of any necessary surface repairs required --- MATERIAL VERIFICATION & HANDLING --- [ ] Membrane Type Verified? (PVC, TPO, EPDM, Bitumen, Other (Specify)) [ ] Batch Number(s) Verified [ ] Membrane Manufacturing Details [ ] Material Certificates [ ] Storage Conditions Verified? (Yes, No) [ ] Storage Condition Notes (if No) [ ] Number of Rolls/Units Received --- SUBSTRATE PREPARATION & PRIMING --- [ ] Describe Existing Substrate Condition (e.g., concrete, wood, metal) [ ] Substrate Cleaning Required? (Yes - Sweep/Vacuum, Yes - Pressure Wash, Yes - Chemical Cleaning, No - Clean Enough) [ ] Substrate Moisture Content (%) [ ] Note any repairs needed to the substrate (cracks, voids, delamination) [ ] Substrate Repair Method (Concrete Patching, Wood Replacement, Metal Repair, Other (Specify)) [ ] If 'Other' selected in Substrate Repair Method, describe repair: [ ] Primer Type (Primer A, Primer B, Primer C, As per Manufacturer's Recommendation) [ ] Primer Application Rate (e.g., ft²/gallon) [ ] Notes on Primer Application (e.g., weather conditions, dry time) --- MEMBRANE INSTALLATION & OVERLAP --- [ ] Sheet Temperature During Installation (minimum) [ ] Ambient Temperature During Installation (minimum) [ ] Membrane Orientation (roll direction) (Parallel to Roof Slope, Perpendicular to Roof Slope, As per Manufacturer's Recommendation) [ ] Minimum Overlap Width (longitudinal) [ ] Minimum Overlap Width (transverse) [ ] Description of any deviations from manufacturer's overlap recommendations and justification [ ] Methods used to secure membrane during installation (select all that apply) (Sandbags, Temporary Adhesive, Weighted Boards, Other (specify in LONG_TEXT)) [ ] Photo Evidence of Proper Overlap & Positioning (at least 2 photos) --- SEAM WELDING / ADHERING (IF APPLICABLE) --- [ ] Membrane Welding Method (If Applicable) (Hot Air Welding, Hot Wedge Welding, Open Flame Welding, Cold Bonding Adhesive) [ ] Welding Temperature (if applicable) [ ] Welding Pressure (if applicable) [ ] Overlap Width (Welded Seams) - Minimum (inches/mm) [ ] Adhesive Type (If Applicable) (Polyurethane, Acrylic, Epoxy, Other (Specify in LONG_TEXT)) [ ] Adhesive Manufacturer & Product Name (If Applicable) [ ] Seam Inspection Criteria (Check all that apply) (Visual Inspection for Uniformity, Air Leak Test (Vacuum Box), Water Pressure Test, Adhesive Coverage, Proper Seam Fusion) [ ] Upload Photos of Representative Welds/Adhesive Application --- DETAILING & PENETRATION FLASHINGS --- [ ] Penetration Type Identified? (Pipe, Vent, Duct, Chimney, Other) [ ] Number of Penetrations Flashed [ ] Flashing Material Used? (Membrane Material, Compatible Metal, Other (Specify in Long Text)) [ ] Details of 'Other' Flashing Material (if applicable) [ ] Flashing Lap Over Membrane? (Yes, No) [ ] Minimum Lap Length (inches) [ ] Photo of Flashing Detail [ ] Flashing Sealed at Perimeter? (Yes, No) [ ] Any Deviations from Standard Flashing Details? --- QUALITY CONTROL & TESTING --- [ ] Wind Uplift Test Pressure (kPa) [ ] Seam Strength Test Result (N/mm) [ ] Visual Inspection - Membrane Defects Observed? (None, Wrinkles, Tears, Pinholes, Discoloration, Other (Specify in LONG_TEXT)) [ ] Details of Other Defects Observed (if applicable) [ ] Water Pressure Test Pass/Fail (Pass, Fail) [ ] Details of Water Pressure Test Failure (if applicable) [ ] Date of Water Pressure Test [ ] Upload Photos of Quality Control Checks [ ] Inspector Name [ ] Inspector Signature --- POST-INSTALLATION & PROTECTION --- [ ] Date of Final Inspection [ ] Observations During Final Inspection (damage, potential issues) [ ] Temperature During Final Inspection (degrees Celsius/Fahrenheit) [ ] Protection Board Installed? (Yes, No) [ ] Details Regarding Protection Board Installation (type, condition) [ ] Photos of Installed Membrane and Protection (if applicable) [ ] Client Sign-Off Received? (Yes, No) [ ] Contractor Signature (acknowledging completion & protection) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/waterproofing-membrane-installation-checklist (Click "Install Template" to launch your digital inspection tool immediately)